Sponsored Links
-->

Saturday, June 30, 2018

File:Chestnut Hill West Line platforms facing south, North ...
src: upload.wikimedia.org

The Chestnut Hill West Line is a commuter rail line in the SEPTA Regional Rail network. It connects Northwest Philadelphia, including the eponymous neighborhood of Chestnut Hill, as well as West Mount Airy and Germantown, to Center City.


Video Chestnut Hill West Line



Route description

The Chestnut Hill West Line branches off from Amtrak's Northeast Corridor at North Philadelphia station and runs entirely within the City of Philadelphia. Its terminal is named Chestnut Hill West to distinguish it from the end of the Chestnut Hill East Line (a competing line of the Reading Company until 1976). Some stations are less than half a mile apart, a characteristic more commonly seen in an urban rapid transit system rather than a commuter rail line. The line runs roughly parallel to the Chestnut Hill East, and the two terminals are rather close.


Maps Chestnut Hill West Line



History

The line was originally opened June 11, 1884 by the Philadelphia, Germantown and Chestnut Hill Railroad, and was operated by the Pennsylvania Railroad until 1968. Electrified service began on March 30, 1918. The Penn Central operated it until 1976, turning operations over to Conrail until 1983, when SEPTA took over.

Between 1984-2010 the route was designated R8 Chestnut Hill West as part of SEPTA's diametrical reorganization of its lines. Chestnut Hill West trains operated through the city center to the Fox Chase Line. Plans had called for the line to be paired with West Chester/Elwyn Line and designated R3, but this depended on a never-built connection from the Chestnut Hill West Line to the ex-Reading near Wayne Junction.

Between June 26, 1987-December 17, 1989 service terminated at Allen Lane with shuttle buses serving St. Martin's, Highland and Chestnut Hill West because of unsafe conditions on the Cresheim Valley bridge. The original iron bridge dated to 1884 and was replaced with a $7.6 million steel structure financed by the Urban Mass Transportation Administration.

SEPTA activated positive train control on the Chestnut Hill West Line on August 22, 2016.


File:Chestnut Hill West Line platforms facing north, North ...
src: upload.wikimedia.org


Stations

The Chestnut Hill West makes the following station stops after leaving 30th Street Station; stations indicated with gray background are closed. All stations are located within Philadelphia.


File:Chestnut Hill West Line platforms facing south, North ...
src: upload.wikimedia.org


Ridership

Yearly ridership on the Chestnut Hill West Line between FY 2008-FY 2014 has remained steady around 1.5-1.6 million:


Chestnut Hill West Train Schedule Weekend - Best Hill 2018
src: planphilly.com


References


File:Chestnut Hill West Line platforms facing south, North ...
src: upload.wikimedia.org


External links

  • "SEPTA - Chestnut Hill West line schedule" (PDF). 

Source of article : Wikipedia